Road Construction · Abuja, FCT

Road and drainage infrastructure works completed.

Real photography of the completed road — paved, kerbed, marked and lit.

Worker finishing the painted kerb edge by hand beside the completed road, with lane markings running into the distance and a wheelbarrow on the sidewalk

The Road

Fully paved

The carriageway is surfaced in asphalt end to end, with cast kerbs painted in black and white along both shoulders and white lane markings set out down the centre.

Reinforced concrete drainage channel under construction alongside the road, with rebar visible and a worker inside the trench

The Drainage

Infrastructure in place

A reinforced concrete drainage channel was built alongside the carriageway, carrying run-off away from the road surface beneath the finished works.

Completed Project

Road Construction, finished.

Finished road at dusk with a project signboard on the left shoulder and palm trees either side
Row of illuminated streetlights along the finished road's paved sidewalk at dusk
Close-up of the black-and-white painted kerb edge beside the new asphalt surface
Close-up of the finished kerb next to interlocking paving stones on the sidewalk
Excavator digging the road trench during earthworks, with a multi-storey building in the background

Development Details

Specifications.

Location
Abuja, FCT
Status
Completed

Interested in Road Construction?

Request Details